Research on the Method of Measuring and Calculating the Cost of Temporary Protection Engineering Measures for Water and Soil Conservation in Substation

Xiaoyong Yang, Fuyan Liu, Min Yu, Xiaoyan Yu

2022

Abstract

With the increase of relevant national standards and the public’s awareness of environmental protection and environmental protection, more and more attention has been paid to water and soil conservation in substation projects. The investment in water and soil conservation measures has become one of the necessary components of the cost of substation projects. However, the current scientific calculation of the cost of water and soil conservation measures for substation projects lacks corresponding standards, which is not conducive to project cost control and investment benefits. Therefore, this paper takes the soil and water conservation measures of the temporary protection project of substation as an example. Based on the analysis of the current situation of the measure plan, firstly, the main factors affecting the investment of the temporary protection project of the substation are analyzed systematically; then the measures based on the linear regression analysis are constructed. Cost calculation model; finally, combined with empirical analysis, the validity of the model is verified.

Download


Paper Citation


in Harvard Style

Yang X., Liu F., Yu M. and Yu X. (2022). Research on the Method of Measuring and Calculating the Cost of Temporary Protection Engineering Measures for Water and Soil Conservation in Substation. In Proceedings of the International Conference on Big Data Economy and Digital Management - Volume 1: BDEDM, ISBN 978-989-758-593-7, pages 156-160. DOI: 10.5220/0011167300003440


in Bibtex Style

@conference{bdedm22,
author={Xiaoyong Yang and Fuyan Liu and Min Yu and Xiaoyan Yu},
title={Research on the Method of Measuring and Calculating the Cost of Temporary Protection Engineering Measures for Water and Soil Conservation in Substation},
booktitle={Proceedings of the International Conference on Big Data Economy and Digital Management - Volume 1: BDEDM,},
year={2022},
pages={156-160},
publisher={SciTePress},
organization={INSTICC},
doi={10.5220/0011167300003440},
isbn={978-989-758-593-7},
}


in EndNote Style

TY - CONF

JO - Proceedings of the International Conference on Big Data Economy and Digital Management - Volume 1: BDEDM,
TI - Research on the Method of Measuring and Calculating the Cost of Temporary Protection Engineering Measures for Water and Soil Conservation in Substation
SN - 978-989-758-593-7
AU - Yang X.
AU - Liu F.
AU - Yu M.
AU - Yu X.
PY - 2022
SP - 156
EP - 160
DO - 10.5220/0011167300003440