Authors:
Aprilia Dhiya Ulhaq
;
Yusuf Latief
and
Rossy Armyn Machfudiyanto
Affiliation:
Department of Civil Engineering, Universitas Indonesia, Jakarta, Indonesia, Indonesia
Keyword(s):
Safety Plan, Risk Identification, Dams, Access Roads, Bridges, Tunnels, Dodge Channel, OHS Performance.
Abstract:
Of all existing construction projects such as buildings, roads, dams, irrigation channels, bridges and tunnels,
Dam is one of the construction projects that has the highest probability of a workplace accident in the world.
By developing a safety plan based on the use of WBS (Work Breakdown Structure) that has been standardized
as an object in this research to obtain risks that have an impact on workplace accidents, it is expected to reduce
the level of workplace accidents that occur. This study aims to develop a safety plan to reduce the level of
workplace accidents as one indicator of OHS (Occupational Health and Safety) performance using qualitative
methods. The results of this study are sources of risk and risk that are classified as high which have potential
hazards and have an influence on OHS performance on the components of the Road Access and Bridges as
well as Tunnels and Dodge Channels. In addition, a safety plan document will be developed based on the
RK3K PU 05 /
PRT / M / 2014 format and refers to the high risks that have been identified based on the WBS
to achieve improved OHS performance by reducing the rate of workplace accidents.
(More)